Technical Design of the Uglich and Rybinsk Hydroelectric Complexes Approved
Uglich HPP design capacity: 110 MW with two generating units.
Industry, infrastructure and technology changed rapidly between 1938 and 1946, reshaping production, mobility and the material foundations of war and post-war recovery.
On 23 May 1938, in USSR, the milestone “Technical Design of the Uglich and Rybinsk Hydroelectric Complexes Approved” occurred. WWII CHRONOS records it as a specific industrial or technological event rather than as a vague multi-year trend.
Verified figure or fact: Uglich HPP design capacity: 110 MW with two generating units. Physical measurements in WWII CHRONOS are expressed in the metric system.
This hydropower milestone helps explain the material systems behind the era: factories, energy, transport networks, extraction, communications, new materials and production methods.
Where an industrial achievement was tied to war, coercion or forced labour, the technical accomplishment must be read together with that human and political context rather than celebrated in isolation.
Editorial status: Date, core fact and quantitative figure verified. The source below supports the period and central claim; unsupported details have deliberately not been added.